{
    "api_version": "1",
    "kind": "dse_post",
    "self": "https://update.dsesecurity.com/api/v1/posts/keep-tornado-safe-rooms-available-signed-occupancy-ready/",
    "item": {
        "id": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/",
        "slug": "keep-tornado-safe-rooms-available-signed-occupancy-ready",
        "url": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/",
        "alternate_urls": {
            "markdown": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready.md",
            "json": "https://update.dsesecurity.com/api/v1/posts/keep-tornado-safe-rooms-available-signed-occupancy-ready/"
        },
        "title": "Keep tornado safe rooms available, signed, supplied, and occupancy-ready",
        "summary": "A certified safe room can fail operationally when it is locked, used for storage, missing from the warning plan, over capacity, poorly signed, inaccessible, or not maintained as its approved design requires.",
        "format": {
            "slug": "checklist",
            "name": "Checklist"
        },
        "priority": {
            "slug": "important",
            "name": "Important"
        },
        "featured": false,
        "image": {
            "theme": "continuity-recovery",
            "label": "Continuity & recovery",
            "alt": "Paired infrastructure paths converging on a stable recovered service.",
            "card_url": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-card.webp?v=1.8.20",
            "hero_url": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-hero.webp?v=1.8.20",
            "social_url": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-social-v2.jpg?v=1.8.20",
            "width": 2400,
            "height": 1350
        },
        "topics": [
            {
                "slug": "business-continuity",
                "name": "Business Continuity",
                "url": "https://update.dsesecurity.com/topic/business-continuity/"
            }
        ],
        "author": {
            "name": "DSE Security Editorial Team",
            "url": "https://update.dsesecurity.com/#editorial-team",
            "type": "Organization"
        },
        "publisher": {
            "name": "Detection Systems & Engineering",
            "url": "https://dsesecurity.com/"
        },
        "published_at": "2026-08-11T10:31:00+00:00",
        "modified_at": "2026-08-11T15:18:11+00:00",
        "reviewed_on": "2026-08-11",
        "reading_minutes": 3,
        "word_count": 637,
        "potentially_affected": "Community and workplace tornado safe rooms, storm shelters, refuge routes, warning and activation procedures, doors and hardware, signage, emergency supplies, accessibility, capacity, inspections, drills, and facility alterations.",
        "dse_recommendation": "Preserve the approved safe-room design and documentation, assign an operations owner, keep the room and route immediately usable, define activation and accountability, inspect critical features, control alterations, and drill arrival before warning time expires.",
        "primary_source": {
            "name": "FEMA P-361: Safe Rooms for Tornadoes and Hurricanes, Fourth Edition",
            "url": "https://www.fema.gov/sites/default/files/documents/fema_rsl_fema-p-361-safe-rooms-for-tornadoes-and-hurricanes_042025.pdf",
            "published_on": "2025-04-01",
            "authority": "Federal Emergency Management Agency"
        },
        "publishing_principles": "https://update.dsesecurity.com/updates/dse-updates-editorial-methodology/",
        "usage_info": "https://update.dsesecurity.com/usage/",
        "copyright_notice": "Copyright © 2026 Detection Systems & Engineering. All rights reserved.",
        "content_html": "<h2>Source facts: a safe room has operational requirements as well as structural ones</h2>\n<p><a href=\"https://www.fema.gov/sites/default/files/documents/fema_rsl_fema-p-361-safe-rooms-for-tornadoes-and-hurricanes_042025.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><em>FEMA P-361, Safe Rooms for Tornadoes and Hurricanes</em>, Fourth Edition</a> provides planning, design, construction, inspection, operation, and maintenance guidance for residential and community safe rooms. FEMA distinguishes a storm shelter that meets ICC 500 from a FEMA safe room, which also meets FEMA’s more stringent criteria intended to provide near-absolute protection from the design event. “Near-absolute” is not an unlimited guarantee against every possible event.</p>\n<p>The 2025 edition uses ICC 500-2023 as a companion reference. It addresses hazard assessment, occupant capacity, travel time, accessibility, signage, communications, emergency supplies, operations and maintenance planning, and protection of the envelope and its openings. A safe room must remain consistent with its approved design; doors, hardware, penetrations, ventilation, and surrounding construction are not ordinary components that can be changed without review.</p>\n<p>FEMA criteria apply to FEMA-funded safe rooms as described in the publication. The adopted code, ICC 500 edition, grant conditions, approved construction documents, authority having jurisdiction, and qualified design professionals govern a specific facility. An interior room called a “tornado room” is not necessarily a compliant storm shelter or FEMA safe room.</p>\n\n<h2>DSE recommendation: operate the room so protection is available on warning</h2>\n<p>Start with the record. Identify the room’s exact classification, design criteria, approved occupant capacity, intended population, responsible owner, inspection requirements, and as-built documents. If that evidence is missing, engage the design professional and authority having jurisdiction; do not infer performance from thick walls or a label.</p>\n<ol>\n<li><strong>Protect the route and arrival time.</strong> Map travel from every occupied area, including public, warehouse, outdoor, and accessible locations. Account for stairs, secured doors, turnstiles, elevators, shift staffing, visitors, children, and people who need assistance. The activation threshold must leave enough time to warn, stop work, and reach shelter before hazardous winds arrive.</li>\n<li><strong>Keep access immediate.</strong> Do not allow a locked door, stored furniture, pallet, floor mat, temporary partition, or access-control schedule to delay entry. If security controls protect the room in ordinary conditions, document their emergency release and a reliable manual alternative. Keep the door’s full closing and latching path clear.</li>\n<li><strong>Control capacity.</strong> Post the approved capacity and define overflow destinations before an event. Consider employees, contractors, visitors, occupants with mobility devices, service animals, and expected public use. Never solve overcrowding by blocking required door operation or placing people in unapproved adjoining space.</li>\n<li><strong>Inspect protective features.</strong> Use the approved operations and maintenance plan to check doors, frames, hinges, latches, closers, labels, seals, ventilation openings, protective covers, penetrations, signs, lighting, communications, drainage, moisture, corrosion, and damage. Route deficiencies to qualified evaluation and record repair and retest.</li>\n<li><strong>Prepare occupied operations.</strong> Maintain approved first-aid and emergency supplies, accessible communication, occupant accountability, sanitation arrangements where needed, and a way to receive authoritative weather information. Define who decides entry, who checks the room, who brings visitor records, and who authorizes exit.</li>\n<li><strong>Control every alteration.</strong> Prevent unreviewed cable, pipe, duct, access reader, camera, shelf, fastener, door contact, or finish work from penetrating or loading the protective assembly. Require the original design criteria and qualified review in the work order.</li>\n</ol>\n<p>Run timed, announced drills during representative shifts. Measure warning receipt, decision time, travel, door closure, accountability, communications, and capacity without creating panic or exposing occupants to weather. Include an unavailable coordinator, a person needing assistance, a blocked preferred route, visitors, and loss of normal power.</p>\n<p>After each drill, warning, severe-weather event, impact, leak, or nearby construction activity, inspect and document the room before returning it to ordinary readiness. The operating test is simple: the correct people can recognize the warning, reach the protected space, secure it as designed, remain there safely, and leave only when authorized.</p>\n\n<h2>Official references</h2>\n<ul>\n<li>Federal Emergency Management Agency, <a href=\"https://www.fema.gov/sites/default/files/documents/fema_rsl_fema-p-361-safe-rooms-for-tornadoes-and-hurricanes_042025.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><em>FEMA P-361, Safe Rooms for Tornadoes and Hurricanes</em>, Fourth Edition</a>, April 2025.</li>\n<li>FEMA, <a href=\"https://www.fema.gov/emergency-managers/risk-management/building-science/safe-rooms\" target=\"_blank\" rel=\"noopener noreferrer\">Safe Rooms for Tornadoes and Hurricanes</a>, Building Science resource center.</li>\n</ul>",
        "content_text": "Source facts: a safe room has operational requirements as well as structural ones\nFEMA P-361, Safe Rooms for Tornadoes and Hurricanes, Fourth Edition provides planning, design, construction, inspection, operation, and maintenance guidance for residential and community safe rooms. FEMA distinguishes a storm shelter that meets ICC 500 from a FEMA safe room, which also meets FEMA’s more stringent criteria intended to provide near-absolute protection from the design event. “Near-absolute” is not an unlimited guarantee against every possible event.\nThe 2025 edition uses ICC 500-2023 as a companion reference. It addresses hazard assessment, occupant capacity, travel time, accessibility, signage, communications, emergency supplies, operations and maintenance planning, and protection of the envelope and its openings. A safe room must remain consistent with its approved design; doors, hardware, penetrations, ventilation, and surrounding construction are not ordinary components that can be changed without review.\nFEMA criteria apply to FEMA-funded safe rooms as described in the publication. The adopted code, ICC 500 edition, grant conditions, approved construction documents, authority having jurisdiction, and qualified design professionals govern a specific facility. An interior room called a “tornado room” is not necessarily a compliant storm shelter or FEMA safe room.\n\nDSE recommendation: operate the room so protection is available on warning\nStart with the record. Identify the room’s exact classification, design criteria, approved occupant capacity, intended population, responsible owner, inspection requirements, and as-built documents. If that evidence is missing, engage the design professional and authority having jurisdiction; do not infer performance from thick walls or a label.\n\nProtect the route and arrival time. Map travel from every occupied area, including public, warehouse, outdoor, and accessible locations. Account for stairs, secured doors, turnstiles, elevators, shift staffing, visitors, children, and people who need assistance. The activation threshold must leave enough time to warn, stop work, and reach shelter before hazardous winds arrive.\nKeep access immediate. Do not allow a locked door, stored furniture, pallet, floor mat, temporary partition, or access-control schedule to delay entry. If security controls protect the room in ordinary conditions, document their emergency release and a reliable manual alternative. Keep the door’s full closing and latching path clear.\nControl capacity. Post the approved capacity and define overflow destinations before an event. Consider employees, contractors, visitors, occupants with mobility devices, service animals, and expected public use. Never solve overcrowding by blocking required door operation or placing people in unapproved adjoining space.\nInspect protective features. Use the approved operations and maintenance plan to check doors, frames, hinges, latches, closers, labels, seals, ventilation openings, protective covers, penetrations, signs, lighting, communications, drainage, moisture, corrosion, and damage. Route deficiencies to qualified evaluation and record repair and retest.\nPrepare occupied operations. Maintain approved first-aid and emergency supplies, accessible communication, occupant accountability, sanitation arrangements where needed, and a way to receive authoritative weather information. Define who decides entry, who checks the room, who brings visitor records, and who authorizes exit.\nControl every alteration. Prevent unreviewed cable, pipe, duct, access reader, camera, shelf, fastener, door contact, or finish work from penetrating or loading the protective assembly. Require the original design criteria and qualified review in the work order.\n\nRun timed, announced drills during representative shifts. Measure warning receipt, decision time, travel, door closure, accountability, communications, and capacity without creating panic or exposing occupants to weather. Include an unavailable coordinator, a person needing assistance, a blocked preferred route, visitors, and loss of normal power.\nAfter each drill, warning, severe-weather event, impact, leak, or nearby construction activity, inspect and document the room before returning it to ordinary readiness. The operating test is simple: the correct people can recognize the warning, reach the protected space, secure it as designed, remain there safely, and leave only when authorized.\n\nOfficial references\n\nFederal Emergency Management Agency, FEMA P-361, Safe Rooms for Tornadoes and Hurricanes, Fourth Edition, April 2025.\nFEMA, Safe Rooms for Tornadoes and Hurricanes, Building Science resource center.",
        "content_markdown": "## Source facts: a safe room has operational requirements as well as structural ones\n\n[FEMA P-361, Safe Rooms for Tornadoes and Hurricanes, Fourth Edition](https://www.fema.gov/sites/default/files/documents/fema_rsl_fema-p-361-safe-rooms-for-tornadoes-and-hurricanes_042025.pdf) provides planning, design, construction, inspection, operation, and maintenance guidance for residential and community safe rooms. FEMA distinguishes a storm shelter that meets ICC 500 from a FEMA safe room, which also meets FEMA’s more stringent criteria intended to provide near-absolute protection from the design event. “Near-absolute” is not an unlimited guarantee against every possible event.\n\nThe 2025 edition uses ICC 500-2023 as a companion reference. It addresses hazard assessment, occupant capacity, travel time, accessibility, signage, communications, emergency supplies, operations and maintenance planning, and protection of the envelope and its openings. A safe room must remain consistent with its approved design; doors, hardware, penetrations, ventilation, and surrounding construction are not ordinary components that can be changed without review.\n\nFEMA criteria apply to FEMA-funded safe rooms as described in the publication. The adopted code, ICC 500 edition, grant conditions, approved construction documents, authority having jurisdiction, and qualified design professionals govern a specific facility. An interior room called a “tornado room” is not necessarily a compliant storm shelter or FEMA safe room.\n\n## DSE recommendation: operate the room so protection is available on warning\n\nStart with the record. Identify the room’s exact classification, design criteria, approved occupant capacity, intended population, responsible owner, inspection requirements, and as-built documents. If that evidence is missing, engage the design professional and authority having jurisdiction; do not infer performance from thick walls or a label.\n\n- Protect the route and arrival time. Map travel from every occupied area, including public, warehouse, outdoor, and accessible locations. Account for stairs, secured doors, turnstiles, elevators, shift staffing, visitors, children, and people who need assistance. The activation threshold must leave enough time to warn, stop work, and reach shelter before hazardous winds arrive.\n\n- Keep access immediate. Do not allow a locked door, stored furniture, pallet, floor mat, temporary partition, or access-control schedule to delay entry. If security controls protect the room in ordinary conditions, document their emergency release and a reliable manual alternative. Keep the door’s full closing and latching path clear.\n\n- Control capacity. Post the approved capacity and define overflow destinations before an event. Consider employees, contractors, visitors, occupants with mobility devices, service animals, and expected public use. Never solve overcrowding by blocking required door operation or placing people in unapproved adjoining space.\n\n- Inspect protective features. Use the approved operations and maintenance plan to check doors, frames, hinges, latches, closers, labels, seals, ventilation openings, protective covers, penetrations, signs, lighting, communications, drainage, moisture, corrosion, and damage. Route deficiencies to qualified evaluation and record repair and retest.\n\n- Prepare occupied operations. Maintain approved first-aid and emergency supplies, accessible communication, occupant accountability, sanitation arrangements where needed, and a way to receive authoritative weather information. Define who decides entry, who checks the room, who brings visitor records, and who authorizes exit.\n\n- Control every alteration. Prevent unreviewed cable, pipe, duct, access reader, camera, shelf, fastener, door contact, or finish work from penetrating or loading the protective assembly. Require the original design criteria and qualified review in the work order.\n\nRun timed, announced drills during representative shifts. Measure warning receipt, decision time, travel, door closure, accountability, communications, and capacity without creating panic or exposing occupants to weather. Include an unavailable coordinator, a person needing assistance, a blocked preferred route, visitors, and loss of normal power.\n\nAfter each drill, warning, severe-weather event, impact, leak, or nearby construction activity, inspect and document the room before returning it to ordinary readiness. The operating test is simple: the correct people can recognize the warning, reach the protected space, secure it as designed, remain there safely, and leave only when authorized.\n\n## Official references\n\n- Federal Emergency Management Agency, [FEMA P-361, Safe Rooms for Tornadoes and Hurricanes, Fourth Edition](https://www.fema.gov/sites/default/files/documents/fema_rsl_fema-p-361-safe-rooms-for-tornadoes-and-hurricanes_042025.pdf), April 2025.\n\n- FEMA, [Safe Rooms for Tornadoes and Hurricanes](https://www.fema.gov/emergency-managers/risk-management/building-science/safe-rooms), Building Science resource center."
    },
    "json_ld": {
        "@context": "https://schema.org",
        "@graph": [
            {
                "@type": "Organization",
                "@id": "https://dsesecurity.com/#organization",
                "name": "Detection Systems & Engineering",
                "alternateName": "DSE Security",
                "url": "https://dsesecurity.com/",
                "logo": {
                    "@type": "ImageObject",
                    "url": "https://update.dsesecurity.com/assets/dse-logo-20260812.png?v=1.8.20"
                }
            },
            {
                "@type": "Organization",
                "@id": "https://update.dsesecurity.com/#editorial-team",
                "name": "DSE Security Editorial Team",
                "url": "https://update.dsesecurity.com/",
                "parentOrganization": {
                    "@id": "https://dsesecurity.com/#organization"
                }
            },
            {
                "@type": "WebSite",
                "@id": "https://update.dsesecurity.com/#website",
                "name": "DSE Updates",
                "alternateName": "DSE Security Knowledge Hub",
                "url": "https://update.dsesecurity.com/",
                "inLanguage": "en-US",
                "publisher": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "potentialAction": {
                    "@type": "SearchAction",
                    "target": {
                        "@type": "EntryPoint",
                        "urlTemplate": "https://update.dsesecurity.com/?q={search_term_string}"
                    },
                    "query-input": "required name=search_term_string"
                }
            },
            {
                "@type": "WebPage",
                "@id": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/",
                "url": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/",
                "isPartOf": {
                    "@id": "https://update.dsesecurity.com/#website"
                },
                "lastReviewed": "2026-08-11"
            },
            {
                "@type": "BreadcrumbList",
                "@id": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/#breadcrumbs",
                "itemListElement": [
                    {
                        "@type": "ListItem",
                        "position": 1,
                        "name": "DSE Updates",
                        "item": "https://update.dsesecurity.com/"
                    },
                    {
                        "@type": "ListItem",
                        "position": 2,
                        "name": "Keep tornado safe rooms available, signed, supplied, and occupancy-ready",
                        "item": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/"
                    }
                ]
            },
            {
                "@type": [
                    "Article",
                    "TechArticle"
                ],
                "@id": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/#article",
                "identifier": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/",
                "url": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/",
                "headline": "Keep tornado safe rooms available, signed, supplied, and occupancy-ready",
                "description": "A certified safe room can fail operationally when it is locked, used for storage, missing from the warning plan, over capacity, poorly signed…",
                "abstract": "A certified safe room can fail operationally when it is locked, used for storage, missing from the warning plan, over capacity, poorly signed, inaccessible, or not maintained as its approved design requires.",
                "articleBody": "Source facts: a safe room has operational requirements as well as structural ones\nFEMA P-361, Safe Rooms for Tornadoes and Hurricanes, Fourth Edition provides planning, design, construction, inspection, operation, and maintenance guidance for residential and community safe rooms. FEMA distinguishes a storm shelter that meets ICC 500 from a FEMA safe room, which also meets FEMA’s more stringent criteria intended to provide near-absolute protection from the design event. “Near-absolute” is not an unlimited guarantee against every possible event.\nThe 2025 edition uses ICC 500-2023 as a companion reference. It addresses hazard assessment, occupant capacity, travel time, accessibility, signage, communications, emergency supplies, operations and maintenance planning, and protection of the envelope and its openings. A safe room must remain consistent with its approved design; doors, hardware, penetrations, ventilation, and surrounding construction are not ordinary components that can be changed without review.\nFEMA criteria apply to FEMA-funded safe rooms as described in the publication. The adopted code, ICC 500 edition, grant conditions, approved construction documents, authority having jurisdiction, and qualified design professionals govern a specific facility. An interior room called a “tornado room” is not necessarily a compliant storm shelter or FEMA safe room.\n\nDSE recommendation: operate the room so protection is available on warning\nStart with the record. Identify the room’s exact classification, design criteria, approved occupant capacity, intended population, responsible owner, inspection requirements, and as-built documents. If that evidence is missing, engage the design professional and authority having jurisdiction; do not infer performance from thick walls or a label.\n\nProtect the route and arrival time. Map travel from every occupied area, including public, warehouse, outdoor, and accessible locations. Account for stairs, secured doors, turnstiles, elevators, shift staffing, visitors, children, and people who need assistance. The activation threshold must leave enough time to warn, stop work, and reach shelter before hazardous winds arrive.\nKeep access immediate. Do not allow a locked door, stored furniture, pallet, floor mat, temporary partition, or access-control schedule to delay entry. If security controls protect the room in ordinary conditions, document their emergency release and a reliable manual alternative. Keep the door’s full closing and latching path clear.\nControl capacity. Post the approved capacity and define overflow destinations before an event. Consider employees, contractors, visitors, occupants with mobility devices, service animals, and expected public use. Never solve overcrowding by blocking required door operation or placing people in unapproved adjoining space.\nInspect protective features. Use the approved operations and maintenance plan to check doors, frames, hinges, latches, closers, labels, seals, ventilation openings, protective covers, penetrations, signs, lighting, communications, drainage, moisture, corrosion, and damage. Route deficiencies to qualified evaluation and record repair and retest.\nPrepare occupied operations. Maintain approved first-aid and emergency supplies, accessible communication, occupant accountability, sanitation arrangements where needed, and a way to receive authoritative weather information. Define who decides entry, who checks the room, who brings visitor records, and who authorizes exit.\nControl every alteration. Prevent unreviewed cable, pipe, duct, access reader, camera, shelf, fastener, door contact, or finish work from penetrating or loading the protective assembly. Require the original design criteria and qualified review in the work order.\n\nRun timed, announced drills during representative shifts. Measure warning receipt, decision time, travel, door closure, accountability, communications, and capacity without creating panic or exposing occupants to weather. Include an unavailable coordinator, a person needing assistance, a blocked preferred route, visitors, and loss of normal power.\nAfter each drill, warning, severe-weather event, impact, leak, or nearby construction activity, inspect and document the room before returning it to ordinary readiness. The operating test is simple: the correct people can recognize the warning, reach the protected space, secure it as designed, remain there safely, and leave only when authorized.\n\nOfficial references\n\nFederal Emergency Management Agency, FEMA P-361, Safe Rooms for Tornadoes and Hurricanes, Fourth Edition, April 2025.\nFEMA, Safe Rooms for Tornadoes and Hurricanes, Building Science resource center.",
                "datePublished": "2026-08-11T10:31:00+00:00",
                "dateModified": "2026-08-11T15:18:11+00:00",
                "mainEntityOfPage": {
                    "@id": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/"
                },
                "inLanguage": "en-US",
                "isAccessibleForFree": true,
                "author": {
                    "@type": "Organization",
                    "name": "DSE Security Editorial Team",
                    "url": "https://update.dsesecurity.com/#editorial-team"
                },
                "publisher": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "image": {
                    "@type": "ImageObject",
                    "@id": "https://update.dsesecurity.com/updates/keep-tornado-safe-rooms-available-signed-occupancy-ready/#primaryimage",
                    "url": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-social-v2.jpg?v=1.8.20",
                    "contentUrl": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-social-v2.jpg?v=1.8.20",
                    "width": 1200,
                    "height": 630,
                    "caption": "Keep tornado safe rooms available, signed, supplied, and occupancy-ready"
                },
                "articleSection": [
                    "Business Continuity"
                ],
                "keywords": [
                    "Business Continuity",
                    "Checklist",
                    "Important priority"
                ],
                "genre": "Checklist",
                "about": [
                    {
                        "@type": "Thing",
                        "name": "Business Continuity",
                        "url": "https://update.dsesecurity.com/topic/business-continuity/"
                    }
                ],
                "wordCount": 637,
                "timeRequired": "PT3M",
                "publishingPrinciples": "https://update.dsesecurity.com/updates/dse-updates-editorial-methodology/",
                "usageInfo": "https://update.dsesecurity.com/usage/",
                "copyrightHolder": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "copyrightNotice": "Copyright © 2026 Detection Systems & Engineering. All rights reserved.",
                "citation": {
                    "@type": "CreativeWork",
                    "name": "FEMA P-361: Safe Rooms for Tornadoes and Hurricanes, Fourth Edition",
                    "url": "https://www.fema.gov/sites/default/files/documents/fema_rsl_fema-p-361-safe-rooms-for-tornadoes-and-hurricanes_042025.pdf",
                    "datePublished": "2025-04-01"
                }
            }
        ]
    }
}