{
    "api_version": "1",
    "kind": "dse_post",
    "self": "https://update.dsesecurity.com/api/v1/posts/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/",
    "item": {
        "id": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/",
        "slug": "plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation",
        "url": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/",
        "alternate_urls": {
            "markdown": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation.md",
            "json": "https://update.dsesecurity.com/api/v1/posts/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/"
        },
        "title": "Plan CORF continuity around time-sensitive outpatient rehabilitation",
        "summary": "Use 42 CFR 485.68 - Emergency preparedness to review this narrow operational decision without extending the source beyond its stated scope.",
        "format": {
            "slug": "playbook",
            "name": "Playbook"
        },
        "priority": {
            "slug": "advisory",
            "name": "Advisory"
        },
        "featured": false,
        "image": {
            "theme": "continuity-recovery",
            "label": "Continuity & recovery",
            "alt": "Paired infrastructure paths converging on a stable recovered service.",
            "card_url": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-card.webp?v=1.8.20",
            "hero_url": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-hero.webp?v=1.8.20",
            "social_url": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-social-v2.jpg?v=1.8.20",
            "width": 2400,
            "height": 1350
        },
        "topics": [
            {
                "slug": "business-continuity",
                "name": "Business Continuity",
                "url": "https://update.dsesecurity.com/topic/business-continuity/"
            },
            {
                "slug": "cybersecurity",
                "name": "Cybersecurity",
                "url": "https://update.dsesecurity.com/topic/cybersecurity/"
            }
        ],
        "author": {
            "name": "DSE Security Editorial Team",
            "url": "https://update.dsesecurity.com/#editorial-team",
            "type": "Organization"
        },
        "publisher": {
            "name": "Detection Systems & Engineering",
            "url": "https://dsesecurity.com/"
        },
        "published_at": "2026-08-27T12:12:01+00:00",
        "modified_at": "2026-08-27T13:06:59+00:00",
        "reviewed_on": "2026-08-26",
        "reading_minutes": 3,
        "word_count": 598,
        "potentially_affected": "Teams, systems, services, or facilities within the stated scope of 42 CFR 485.68 - Emergency preparedness",
        "dse_recommendation": "Compare the observed state with the cited official source, document applicability and exceptions, and test any approved change with rollback safeguards.",
        "primary_source": {
            "name": "42 CFR 485.68 - Emergency preparedness",
            "url": "https://www.ecfr.gov/current/title-42/section-485.68",
            "published_on": null,
            "authority": "www.ecfr.gov"
        },
        "publishing_principles": "https://update.dsesecurity.com/updates/dse-updates-editorial-methodology/",
        "usage_info": "https://update.dsesecurity.com/usage/",
        "copyright_notice": "Copyright © 2026 Detection Systems & Engineering. All rights reserved.",
        "content_html": "<p>Keep this document to one review outcome: Plan CORF continuity around time-sensitive outpatient rehabilitation. Only the official source and traced locations below supply facts. Confirm applicability before acting.</p>\n<h2>Source fact:</h2>\n<p>The official <a href=\"https://www.ecfr.gov/current/title-42/section-485.68\" target=\"_blank\" rel=\"noopener noreferrer\">42 CFR 485.68 &#8211; Emergency preparedness</a> from Centers for Medicare &amp; Medicaid Services via eCFR supports the following bounded statements:</p>\n<ul>\n<li>Under 42 CFR 485, the rule requires that if elected, the unified and integrated emergency preparedness program do all of the following: include integrated policies and procedures that meet the requirements set forth in paragraph (b) of this section, a coordinated communication plan and training and testing programs that meet the requirements of paragraphs (c) and (d) of this section, respectively. The research record locates this support at <strong>42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5))</strong>.</li>\n<li>Under 42 CFR 485, the rule requires that the CORF develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The research record locates this support at <strong>42 CFR 485.68(d) (eCFR anchor p-485.68(d))</strong>.</li>\n</ul>\n<p>Keep the evidence boundary at these traced claims. They support a review of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives; they do not support conclusions outside the source&#8217;s stated conditions.</p>\n<h2>What the source does not establish</h2>\n<p>CORF-specific federal condition; patient mobility, treatment interruption, equipment, referrals, state licensing, and survey guidance require service-specific planning. A correct source interpretation can still be inapplicable to a particular design. Confirm identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery, ownership, and change authority instead of treating documented behavior as a deployment guarantee.</p>\n<h2>Applicability questions</h2>\n<ul>\n<li>For source statement 1 at <strong>42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5))</strong>, which observable configuration, record, or test can confirm applicability here?</li>\n<li>For source statement 2 at <strong>42 CFR 485.68(d) (eCFR anchor p-485.68(d))</strong>, which observable configuration, record, or test can confirm applicability here?</li>\n<li>Which deployed instance of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives will be compared with the source, and why that instance?</li>\n<li>How will the review distinguish a source mismatch from a failure in identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery?</li>\n<li>Who approves the conclusion, exception, test window, and rollback threshold?</li>\n</ul>\n<h2>DSE recommendation:</h2>\n<p>DSE recommends using the cited source as the evidence anchor for this decision. Anchor the review in the cited section and keep observation separate from interpretation. Record the source location, examined part of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives, observed and expected states, owner, and reason for deviation.</p>\n<p>An implementation decision needs an owner, approved window, prechecks, observable outcome, stop authority, and rollback path. Validate identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery before and after the test, and store only sanitized operational evidence.</p>\n<h2>Verification and evidence</h2>\n<p>Tie each conclusion back to <strong>42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5))</strong>; <strong>42 CFR 485.68(d) (eCFR anchor p-485.68(d))</strong> and to observable material such as business-impact records, dependency maps, exercise results, recovery timings, and open corrective actions. Preserve provenance and stable identifiers without copying secrets into the evidence set.</p>\n<p>Preserve both successful and failed observations, along with approval and rollback evidence. Avoid uncontrolled production experiments. Assign an expiry or event-driven recheck so the conclusion is not treated as permanent.</p>\n<h2>Official references</h2>\n<ul>\n<li><a href=\"https://www.ecfr.gov/current/title-42/section-485.68\" target=\"_blank\" rel=\"noopener noreferrer\">42 CFR 485.68 &#8211; Emergency preparedness</a> — Centers for Medicare &amp; Medicaid Services via eCFR</li>\n</ul>",
        "content_text": "Keep this document to one review outcome: Plan CORF continuity around time-sensitive outpatient rehabilitation. Only the official source and traced locations below supply facts. Confirm applicability before acting.\nSource fact:\nThe official 42 CFR 485.68 – Emergency preparedness from Centers for Medicare & Medicaid Services via eCFR supports the following bounded statements:\n\nUnder 42 CFR 485, the rule requires that if elected, the unified and integrated emergency preparedness program do all of the following: include integrated policies and procedures that meet the requirements set forth in paragraph (b) of this section, a coordinated communication plan and training and testing programs that meet the requirements of paragraphs (c) and (d) of this section, respectively. The research record locates this support at 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)).\nUnder 42 CFR 485, the rule requires that the CORF develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The research record locates this support at 42 CFR 485.68(d) (eCFR anchor p-485.68(d)).\n\nKeep the evidence boundary at these traced claims. They support a review of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives; they do not support conclusions outside the source’s stated conditions.\nWhat the source does not establish\nCORF-specific federal condition; patient mobility, treatment interruption, equipment, referrals, state licensing, and survey guidance require service-specific planning. A correct source interpretation can still be inapplicable to a particular design. Confirm identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery, ownership, and change authority instead of treating documented behavior as a deployment guarantee.\nApplicability questions\n\nFor source statement 1 at 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)), which observable configuration, record, or test can confirm applicability here?\nFor source statement 2 at 42 CFR 485.68(d) (eCFR anchor p-485.68(d)), which observable configuration, record, or test can confirm applicability here?\nWhich deployed instance of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives will be compared with the source, and why that instance?\nHow will the review distinguish a source mismatch from a failure in identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery?\nWho approves the conclusion, exception, test window, and rollback threshold?\n\nDSE recommendation:\nDSE recommends using the cited source as the evidence anchor for this decision. Anchor the review in the cited section and keep observation separate from interpretation. Record the source location, examined part of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives, observed and expected states, owner, and reason for deviation.\nAn implementation decision needs an owner, approved window, prechecks, observable outcome, stop authority, and rollback path. Validate identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery before and after the test, and store only sanitized operational evidence.\nVerification and evidence\nTie each conclusion back to 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)); 42 CFR 485.68(d) (eCFR anchor p-485.68(d)) and to observable material such as business-impact records, dependency maps, exercise results, recovery timings, and open corrective actions. Preserve provenance and stable identifiers without copying secrets into the evidence set.\nPreserve both successful and failed observations, along with approval and rollback evidence. Avoid uncontrolled production experiments. Assign an expiry or event-driven recheck so the conclusion is not treated as permanent.\nOfficial references\n\n42 CFR 485.68 – Emergency preparedness — Centers for Medicare & Medicaid Services via eCFR",
        "content_markdown": "Keep this document to one review outcome: Plan CORF continuity around time-sensitive outpatient rehabilitation. Only the official source and traced locations below supply facts. Confirm applicability before acting.\n\n## Source fact:\n\nThe official [42 CFR 485.68 – Emergency preparedness](https://www.ecfr.gov/current/title-42/section-485.68) from Centers for Medicare & Medicaid Services via eCFR supports the following bounded statements:\n\n- Under 42 CFR 485, the rule requires that if elected, the unified and integrated emergency preparedness program do all of the following: include integrated policies and procedures that meet the requirements set forth in paragraph (b) of this section, a coordinated communication plan and training and testing programs that meet the requirements of paragraphs (c) and (d) of this section, respectively. The research record locates this support at 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)).\n\n- Under 42 CFR 485, the rule requires that the CORF develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The research record locates this support at 42 CFR 485.68(d) (eCFR anchor p-485.68(d)).\n\nKeep the evidence boundary at these traced claims. They support a review of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives; they do not support conclusions outside the source’s stated conditions.\n\n## What the source does not establish\n\nCORF-specific federal condition; patient mobility, treatment interruption, equipment, referrals, state licensing, and survey guidance require service-specific planning. A correct source interpretation can still be inapplicable to a particular design. Confirm identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery, ownership, and change authority instead of treating documented behavior as a deployment guarantee.\n\n## Applicability questions\n\n- For source statement 1 at 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)), which observable configuration, record, or test can confirm applicability here?\n\n- For source statement 2 at 42 CFR 485.68(d) (eCFR anchor p-485.68(d)), which observable configuration, record, or test can confirm applicability here?\n\n- Which deployed instance of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives will be compared with the source, and why that instance?\n\n- How will the review distinguish a source mismatch from a failure in identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery?\n\n- Who approves the conclusion, exception, test window, and rollback threshold?\n\n## DSE recommendation:\n\nDSE recommends using the cited source as the evidence anchor for this decision. Anchor the review in the cited section and keep observation separate from interpretation. Record the source location, examined part of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives, observed and expected states, owner, and reason for deviation.\n\nAn implementation decision needs an owner, approved window, prechecks, observable outcome, stop authority, and rollback path. Validate identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery before and after the test, and store only sanitized operational evidence.\n\n## Verification and evidence\n\nTie each conclusion back to 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)); 42 CFR 485.68(d) (eCFR anchor p-485.68(d)) and to observable material such as business-impact records, dependency maps, exercise results, recovery timings, and open corrective actions. Preserve provenance and stable identifiers without copying secrets into the evidence set.\n\nPreserve both successful and failed observations, along with approval and rollback evidence. Avoid uncontrolled production experiments. Assign an expiry or event-driven recheck so the conclusion is not treated as permanent.\n\n## Official references\n\n- [42 CFR 485.68 – Emergency preparedness](https://www.ecfr.gov/current/title-42/section-485.68) — Centers for Medicare & Medicaid Services via eCFR"
    },
    "json_ld": {
        "@context": "https://schema.org",
        "@graph": [
            {
                "@type": "Organization",
                "@id": "https://dsesecurity.com/#organization",
                "name": "Detection Systems & Engineering",
                "alternateName": "DSE Security",
                "url": "https://dsesecurity.com/",
                "logo": {
                    "@type": "ImageObject",
                    "url": "https://update.dsesecurity.com/assets/dse-logo-20260812.png?v=1.8.20"
                }
            },
            {
                "@type": "Organization",
                "@id": "https://update.dsesecurity.com/#editorial-team",
                "name": "DSE Security Editorial Team",
                "url": "https://update.dsesecurity.com/",
                "parentOrganization": {
                    "@id": "https://dsesecurity.com/#organization"
                }
            },
            {
                "@type": "WebSite",
                "@id": "https://update.dsesecurity.com/#website",
                "name": "DSE Updates",
                "alternateName": "DSE Security Knowledge Hub",
                "url": "https://update.dsesecurity.com/",
                "inLanguage": "en-US",
                "publisher": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "potentialAction": {
                    "@type": "SearchAction",
                    "target": {
                        "@type": "EntryPoint",
                        "urlTemplate": "https://update.dsesecurity.com/?q={search_term_string}"
                    },
                    "query-input": "required name=search_term_string"
                }
            },
            {
                "@type": "WebPage",
                "@id": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/",
                "url": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/",
                "isPartOf": {
                    "@id": "https://update.dsesecurity.com/#website"
                },
                "lastReviewed": "2026-08-26"
            },
            {
                "@type": "BreadcrumbList",
                "@id": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/#breadcrumbs",
                "itemListElement": [
                    {
                        "@type": "ListItem",
                        "position": 1,
                        "name": "DSE Updates",
                        "item": "https://update.dsesecurity.com/"
                    },
                    {
                        "@type": "ListItem",
                        "position": 2,
                        "name": "Plan CORF continuity around time-sensitive outpatient rehabilitation",
                        "item": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/"
                    }
                ]
            },
            {
                "@type": [
                    "Article",
                    "TechArticle"
                ],
                "@id": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/#article",
                "identifier": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/",
                "url": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/",
                "headline": "Plan CORF continuity around time-sensitive outpatient rehabilitation",
                "description": "Use 42 CFR 485.68 - Emergency preparedness to review this narrow operational decision without extending the source beyond its stated scope.",
                "abstract": "Use 42 CFR 485.68 - Emergency preparedness to review this narrow operational decision without extending the source beyond its stated scope.",
                "articleBody": "Keep this document to one review outcome: Plan CORF continuity around time-sensitive outpatient rehabilitation. Only the official source and traced locations below supply facts. Confirm applicability before acting.\nSource fact:\nThe official 42 CFR 485.68 – Emergency preparedness from Centers for Medicare & Medicaid Services via eCFR supports the following bounded statements:\n\nUnder 42 CFR 485, the rule requires that if elected, the unified and integrated emergency preparedness program do all of the following: include integrated policies and procedures that meet the requirements set forth in paragraph (b) of this section, a coordinated communication plan and training and testing programs that meet the requirements of paragraphs (c) and (d) of this section, respectively. The research record locates this support at 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)).\nUnder 42 CFR 485, the rule requires that the CORF develop and maintain an emergency preparedness training and testing program that is based on the emergency plan set forth in paragraph (a) of this section, risk assessment at paragraph (a)(1) of this section, policies and procedures at paragraph (b) of this section, and the communication plan at paragraph (c) of this section. The research record locates this support at 42 CFR 485.68(d) (eCFR anchor p-485.68(d)).\n\nKeep the evidence boundary at these traced claims. They support a review of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives; they do not support conclusions outside the source’s stated conditions.\nWhat the source does not establish\nCORF-specific federal condition; patient mobility, treatment interruption, equipment, referrals, state licensing, and survey guidance require service-specific planning. A correct source interpretation can still be inapplicable to a particular design. Confirm identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery, ownership, and change authority instead of treating documented behavior as a deployment guarantee.\nApplicability questions\n\nFor source statement 1 at 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)), which observable configuration, record, or test can confirm applicability here?\nFor source statement 2 at 42 CFR 485.68(d) (eCFR anchor p-485.68(d)), which observable configuration, record, or test can confirm applicability here?\nWhich deployed instance of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives will be compared with the source, and why that instance?\nHow will the review distinguish a source mismatch from a failure in identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery?\nWho approves the conclusion, exception, test window, and rollback threshold?\n\nDSE recommendation:\nDSE recommends using the cited source as the evidence anchor for this decision. Anchor the review in the cited section and keep observation separate from interpretation. Record the source location, examined part of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives, observed and expected states, owner, and reason for deviation.\nAn implementation decision needs an owner, approved window, prechecks, observable outcome, stop authority, and rollback path. Validate identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery before and after the test, and store only sanitized operational evidence.\nVerification and evidence\nTie each conclusion back to 42 CFR 485.68(e)(5), read with 42 CFR 485.68(e) (eCFR anchor p-485.68(e)(5)); 42 CFR 485.68(d) (eCFR anchor p-485.68(d)) and to observable material such as business-impact records, dependency maps, exercise results, recovery timings, and open corrective actions. Preserve provenance and stable identifiers without copying secrets into the evidence set.\nPreserve both successful and failed observations, along with approval and rollback evidence. Avoid uncontrolled production experiments. Assign an expiry or event-driven recheck so the conclusion is not treated as permanent.\nOfficial references\n\n42 CFR 485.68 – Emergency preparedness — Centers for Medicare & Medicaid Services via eCFR",
                "datePublished": "2026-08-27T12:12:01+00:00",
                "dateModified": "2026-08-27T13:06:59+00:00",
                "mainEntityOfPage": {
                    "@id": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/"
                },
                "inLanguage": "en-US",
                "isAccessibleForFree": true,
                "author": {
                    "@type": "Organization",
                    "name": "DSE Security Editorial Team",
                    "url": "https://update.dsesecurity.com/#editorial-team"
                },
                "publisher": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "image": {
                    "@type": "ImageObject",
                    "@id": "https://update.dsesecurity.com/updates/plan-corf-continuity-around-time-sensitive-outpatient-rehabilitation/#primaryimage",
                    "url": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-social-v2.jpg?v=1.8.20",
                    "contentUrl": "https://update.dsesecurity.com/assets/editorial/continuity-recovery-social-v2.jpg?v=1.8.20",
                    "width": 1200,
                    "height": 630,
                    "caption": "Plan CORF continuity around time-sensitive outpatient rehabilitation"
                },
                "articleSection": [
                    "Business Continuity",
                    "Cybersecurity"
                ],
                "keywords": [
                    "Business Continuity",
                    "Cybersecurity",
                    "Playbook",
                    "Advisory priority"
                ],
                "genre": "Playbook",
                "about": [
                    {
                        "@type": "Thing",
                        "name": "Business Continuity",
                        "url": "https://update.dsesecurity.com/topic/business-continuity/"
                    },
                    {
                        "@type": "Thing",
                        "name": "Cybersecurity",
                        "url": "https://update.dsesecurity.com/topic/cybersecurity/"
                    }
                ],
                "wordCount": 598,
                "timeRequired": "PT3M",
                "publishingPrinciples": "https://update.dsesecurity.com/updates/dse-updates-editorial-methodology/",
                "usageInfo": "https://update.dsesecurity.com/usage/",
                "copyrightHolder": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "copyrightNotice": "Copyright © 2026 Detection Systems & Engineering. All rights reserved.",
                "citation": {
                    "@type": "CreativeWork",
                    "name": "42 CFR 485.68 - Emergency preparedness",
                    "url": "https://www.ecfr.gov/current/title-42/section-485.68"
                }
            }
        ]
    }
}