{
    "api_version": "1",
    "kind": "dse_post",
    "self": "https://update.dsesecurity.com/api/v1/posts/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/",
    "item": {
        "id": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/",
        "slug": "plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls",
        "url": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/",
        "alternate_urls": {
            "markdown": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls.md",
            "json": "https://update.dsesecurity.com/api/v1/posts/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/"
        },
        "title": "Plan electric-power facility work around the rule's emergency and access controls",
        "summary": "Use 29 CFR 1910.269 - Electric power generation, transmission, and distribution to review this narrow operational decision without extending the source beyond its stated scope.",
        "format": {
            "slug": "briefing",
            "name": "Briefing"
        },
        "priority": {
            "slug": "advisory",
            "name": "Advisory"
        },
        "featured": false,
        "image": {
            "theme": "physical-security",
            "label": "Physical security",
            "alt": "Integrated video surveillance and controlled entry at a modern commercial facility.",
            "card_url": "https://update.dsesecurity.com/assets/editorial/physical-security-card.webp?v=1.8.20",
            "hero_url": "https://update.dsesecurity.com/assets/editorial/physical-security-hero.webp?v=1.8.20",
            "social_url": "https://update.dsesecurity.com/assets/editorial/physical-security-social-v2.jpg?v=1.8.20",
            "width": 2400,
            "height": 1350
        },
        "topics": [
            {
                "slug": "access-control",
                "name": "Access Control",
                "url": "https://update.dsesecurity.com/topic/access-control/"
            },
            {
                "slug": "business-continuity",
                "name": "Business Continuity",
                "url": "https://update.dsesecurity.com/topic/business-continuity/"
            },
            {
                "slug": "cybersecurity",
                "name": "Cybersecurity",
                "url": "https://update.dsesecurity.com/topic/cybersecurity/"
            }
        ],
        "author": {
            "name": "DSE Security Editorial Team",
            "url": "https://update.dsesecurity.com/#editorial-team",
            "type": "Organization"
        },
        "publisher": {
            "name": "Detection Systems & Engineering",
            "url": "https://dsesecurity.com/"
        },
        "published_at": "2026-08-27T12:12:15+00:00",
        "modified_at": "2026-08-27T13:06:58+00:00",
        "reviewed_on": "2026-08-26",
        "reading_minutes": 3,
        "word_count": 607,
        "potentially_affected": "Teams, systems, services, or facilities within the stated scope of 29 CFR 1910.269 - Electric power generation, transmission, and distribution",
        "dse_recommendation": "Compare the observed state with the cited official source, document applicability and exceptions, and test any approved change with rollback safeguards.",
        "primary_source": {
            "name": "29 CFR 1910.269 - Electric power generation, transmission, and distribution",
            "url": "https://www.ecfr.gov/current/title-29/section-1910.269",
            "published_on": null,
            "authority": "www.ecfr.gov"
        },
        "publishing_principles": "https://update.dsesecurity.com/updates/dse-updates-editorial-methodology/",
        "usage_info": "https://update.dsesecurity.com/usage/",
        "copyright_notice": "Copyright © 2026 Detection Systems & Engineering. All rights reserved.",
        "content_html": "<p>Use this document to resolve one bounded operational decision: Plan electric-power facility work around the rule&#8217;s emergency and access controls. Only the official source and traced locations below supply facts. Confirm applicability before acting.</p>\n<h2>Source fact:</h2>\n<p>The official <a href=\"https://www.ecfr.gov/current/title-29/section-1910.269\" target=\"_blank\" rel=\"noopener noreferrer\">29 CFR 1910.269 &#8211; Electric power generation, transmission, and distribution</a> from Occupational Safety and Health Administration via eCFR supports the following bounded statements:</p>\n<ul>\n<li>Under 29 CFR 1910, while work is being performed in a manhole or vault containing energized electric equipment, an employee with first-aid training must be available on the surface in the immediate vicinity of the manhole or vault entrance to render emergency assistance. The research record locates this support at <strong>29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i))</strong>.</li>\n<li>Under 29 CFR 1910, the rule requires that the briefing cover at least the following subjects: hazards associated with the job, work procedures involved, special precautions, energy-source controls, and personal protective equipment requirements. The research record locates this support at <strong>29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2))</strong>.</li>\n</ul>\n<p>These statements are the factual basis for this document. Do not extend them into a broader assurance. Review critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths only where the source and recorded environment align.</p>\n<h2>What the source does not establish</h2>\n<p>Federal workplace rule for covered operations; voltage, task, employee qualification, construction rules, and other electrical standards determine applicability. A correct source interpretation can still be inapplicable to a particular design. Confirm identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders, ownership, and change authority instead of treating documented behavior as a deployment guarantee.</p>\n<h2>Applicability questions</h2>\n<ul>\n<li>For source statement 1 at <strong>29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i))</strong>, which observable configuration, record, or test can confirm applicability here?</li>\n<li>For source statement 2 at <strong>29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2))</strong>, which observable configuration, record, or test can confirm applicability here?</li>\n<li>Which deployed instance of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths will be compared with the source, and why that instance?</li>\n<li>How will the review distinguish a source mismatch from a failure in identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders?</li>\n<li>Who approves the conclusion, exception, test window, and rollback threshold?</li>\n</ul>\n<h2>DSE recommendation:</h2>\n<p>DSE recommends using the cited source as the evidence anchor for this decision. Start with applicability, then compare the observed state with the cited source. Record the source location, examined part of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths, observed and expected states, owner, and reason for deviation.</p>\n<p>Do not move from citation to production in one step. Pilot the decision where practical, observe agreed signals, retain a reversal point, and verify identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders. Handle credentials, keys, recovery data, and personal information through approved secure channels.</p>\n<h2>Verification and evidence</h2>\n<p>Keep the source locations <strong>29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i))</strong>; <strong>29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2))</strong> adjacent to the sanitized artifacts used for comparison. Prefer facility inventories, inspection records, alarm and shutdown tests, maintenance history, recovery exercises, and corrective actions, with enough identity and timing data for an independent recheck.</p>\n<p>Retain the starting state, authorization, execution record, outcome, deviation, and final state as one review package. Move disruptive checks to an approved test path. Reopen the decision when versions, design, dependencies, ownership, or official guidance changes.</p>\n<h2>Official references</h2>\n<ul>\n<li><a href=\"https://www.ecfr.gov/current/title-29/section-1910.269\" target=\"_blank\" rel=\"noopener noreferrer\">29 CFR 1910.269 &#8211; Electric power generation, transmission, and distribution</a> — Occupational Safety and Health Administration via eCFR</li>\n</ul>",
        "content_text": "Use this document to resolve one bounded operational decision: Plan electric-power facility work around the rule’s emergency and access controls. Only the official source and traced locations below supply facts. Confirm applicability before acting.\nSource fact:\nThe official 29 CFR 1910.269 – Electric power generation, transmission, and distribution from Occupational Safety and Health Administration via eCFR supports the following bounded statements:\n\nUnder 29 CFR 1910, while work is being performed in a manhole or vault containing energized electric equipment, an employee with first-aid training must be available on the surface in the immediate vicinity of the manhole or vault entrance to render emergency assistance. The research record locates this support at 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)).\nUnder 29 CFR 1910, the rule requires that the briefing cover at least the following subjects: hazards associated with the job, work procedures involved, special precautions, energy-source controls, and personal protective equipment requirements. The research record locates this support at 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)).\n\nThese statements are the factual basis for this document. Do not extend them into a broader assurance. Review critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths only where the source and recorded environment align.\nWhat the source does not establish\nFederal workplace rule for covered operations; voltage, task, employee qualification, construction rules, and other electrical standards determine applicability. A correct source interpretation can still be inapplicable to a particular design. Confirm identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders, ownership, and change authority instead of treating documented behavior as a deployment guarantee.\nApplicability questions\n\nFor source statement 1 at 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)), which observable configuration, record, or test can confirm applicability here?\nFor source statement 2 at 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)), which observable configuration, record, or test can confirm applicability here?\nWhich deployed instance of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths will be compared with the source, and why that instance?\nHow will the review distinguish a source mismatch from a failure in identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders?\nWho approves the conclusion, exception, test window, and rollback threshold?\n\nDSE recommendation:\nDSE recommends using the cited source as the evidence anchor for this decision. Start with applicability, then compare the observed state with the cited source. Record the source location, examined part of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths, observed and expected states, owner, and reason for deviation.\nDo not move from citation to production in one step. Pilot the decision where practical, observe agreed signals, retain a reversal point, and verify identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders. Handle credentials, keys, recovery data, and personal information through approved secure channels.\nVerification and evidence\nKeep the source locations 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)); 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)) adjacent to the sanitized artifacts used for comparison. Prefer facility inventories, inspection records, alarm and shutdown tests, maintenance history, recovery exercises, and corrective actions, with enough identity and timing data for an independent recheck.\nRetain the starting state, authorization, execution record, outcome, deviation, and final state as one review package. Move disruptive checks to an approved test path. Reopen the decision when versions, design, dependencies, ownership, or official guidance changes.\nOfficial references\n\n29 CFR 1910.269 – Electric power generation, transmission, and distribution — Occupational Safety and Health Administration via eCFR",
        "content_markdown": "Use this document to resolve one bounded operational decision: Plan electric-power facility work around the rule’s emergency and access controls. Only the official source and traced locations below supply facts. Confirm applicability before acting.\n\n## Source fact:\n\nThe official [29 CFR 1910.269 – Electric power generation, transmission, and distribution](https://www.ecfr.gov/current/title-29/section-1910.269) from Occupational Safety and Health Administration via eCFR supports the following bounded statements:\n\n- Under 29 CFR 1910, while work is being performed in a manhole or vault containing energized electric equipment, an employee with first-aid training must be available on the surface in the immediate vicinity of the manhole or vault entrance to render emergency assistance. The research record locates this support at 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)).\n\n- Under 29 CFR 1910, the rule requires that the briefing cover at least the following subjects: hazards associated with the job, work procedures involved, special precautions, energy-source controls, and personal protective equipment requirements. The research record locates this support at 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)).\n\nThese statements are the factual basis for this document. Do not extend them into a broader assurance. Review critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths only where the source and recorded environment align.\n\n## What the source does not establish\n\nFederal workplace rule for covered operations; voltage, task, employee qualification, construction rules, and other electrical standards determine applicability. A correct source interpretation can still be inapplicable to a particular design. Confirm identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders, ownership, and change authority instead of treating documented behavior as a deployment guarantee.\n\n## Applicability questions\n\n- For source statement 1 at 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)), which observable configuration, record, or test can confirm applicability here?\n\n- For source statement 2 at 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)), which observable configuration, record, or test can confirm applicability here?\n\n- Which deployed instance of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths will be compared with the source, and why that instance?\n\n- How will the review distinguish a source mismatch from a failure in identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders?\n\n- Who approves the conclusion, exception, test window, and rollback threshold?\n\n## DSE recommendation:\n\nDSE recommends using the cited source as the evidence anchor for this decision. Start with applicability, then compare the observed state with the cited source. Record the source location, examined part of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths, observed and expected states, owner, and reason for deviation.\n\nDo not move from citation to production in one step. Pilot the decision where practical, observe agreed signals, retain a reversal point, and verify identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders. Handle credentials, keys, recovery data, and personal information through approved secure channels.\n\n## Verification and evidence\n\nKeep the source locations 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)); 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)) adjacent to the sanitized artifacts used for comparison. Prefer facility inventories, inspection records, alarm and shutdown tests, maintenance history, recovery exercises, and corrective actions, with enough identity and timing data for an independent recheck.\n\nRetain the starting state, authorization, execution record, outcome, deviation, and final state as one review package. Move disruptive checks to an approved test path. Reopen the decision when versions, design, dependencies, ownership, or official guidance changes.\n\n## Official references\n\n- [29 CFR 1910.269 – Electric power generation, transmission, and distribution](https://www.ecfr.gov/current/title-29/section-1910.269) — Occupational Safety and Health Administration via eCFR"
    },
    "json_ld": {
        "@context": "https://schema.org",
        "@graph": [
            {
                "@type": "Organization",
                "@id": "https://dsesecurity.com/#organization",
                "name": "Detection Systems & Engineering",
                "alternateName": "DSE Security",
                "url": "https://dsesecurity.com/",
                "logo": {
                    "@type": "ImageObject",
                    "url": "https://update.dsesecurity.com/assets/dse-logo-20260812.png?v=1.8.20"
                }
            },
            {
                "@type": "Organization",
                "@id": "https://update.dsesecurity.com/#editorial-team",
                "name": "DSE Security Editorial Team",
                "url": "https://update.dsesecurity.com/",
                "parentOrganization": {
                    "@id": "https://dsesecurity.com/#organization"
                }
            },
            {
                "@type": "WebSite",
                "@id": "https://update.dsesecurity.com/#website",
                "name": "DSE Updates",
                "alternateName": "DSE Security Knowledge Hub",
                "url": "https://update.dsesecurity.com/",
                "inLanguage": "en-US",
                "publisher": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "potentialAction": {
                    "@type": "SearchAction",
                    "target": {
                        "@type": "EntryPoint",
                        "urlTemplate": "https://update.dsesecurity.com/?q={search_term_string}"
                    },
                    "query-input": "required name=search_term_string"
                }
            },
            {
                "@type": "WebPage",
                "@id": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/",
                "url": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/",
                "isPartOf": {
                    "@id": "https://update.dsesecurity.com/#website"
                },
                "lastReviewed": "2026-08-26"
            },
            {
                "@type": "BreadcrumbList",
                "@id": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/#breadcrumbs",
                "itemListElement": [
                    {
                        "@type": "ListItem",
                        "position": 1,
                        "name": "DSE Updates",
                        "item": "https://update.dsesecurity.com/"
                    },
                    {
                        "@type": "ListItem",
                        "position": 2,
                        "name": "Plan electric-power facility work around the rule's emergency and access controls",
                        "item": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/"
                    }
                ]
            },
            {
                "@type": [
                    "Article",
                    "TechArticle"
                ],
                "@id": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/#article",
                "identifier": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/",
                "url": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/",
                "headline": "Plan electric-power facility work around the rule's emergency and access controls",
                "description": "Use 29 CFR 1910.269 - Electric power generation, transmission, and distribution to review this narrow operational decision without extending the source…",
                "abstract": "Use 29 CFR 1910.269 - Electric power generation, transmission, and distribution to review this narrow operational decision without extending the source beyond its stated scope.",
                "articleBody": "Use this document to resolve one bounded operational decision: Plan electric-power facility work around the rule’s emergency and access controls. Only the official source and traced locations below supply facts. Confirm applicability before acting.\nSource fact:\nThe official 29 CFR 1910.269 – Electric power generation, transmission, and distribution from Occupational Safety and Health Administration via eCFR supports the following bounded statements:\n\nUnder 29 CFR 1910, while work is being performed in a manhole or vault containing energized electric equipment, an employee with first-aid training must be available on the surface in the immediate vicinity of the manhole or vault entrance to render emergency assistance. The research record locates this support at 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)).\nUnder 29 CFR 1910, the rule requires that the briefing cover at least the following subjects: hazards associated with the job, work procedures involved, special precautions, energy-source controls, and personal protective equipment requirements. The research record locates this support at 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)).\n\nThese statements are the factual basis for this document. Do not extend them into a broader assurance. Review critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths only where the source and recorded environment align.\nWhat the source does not establish\nFederal workplace rule for covered operations; voltage, task, employee qualification, construction rules, and other electrical standards determine applicability. A correct source interpretation can still be inapplicable to a particular design. Confirm identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders, ownership, and change authority instead of treating documented behavior as a deployment guarantee.\nApplicability questions\n\nFor source statement 1 at 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)), which observable configuration, record, or test can confirm applicability here?\nFor source statement 2 at 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)), which observable configuration, record, or test can confirm applicability here?\nWhich deployed instance of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths will be compared with the source, and why that instance?\nHow will the review distinguish a source mismatch from a failure in identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders?\nWho approves the conclusion, exception, test window, and rollback threshold?\n\nDSE recommendation:\nDSE recommends using the cited source as the evidence anchor for this decision. Start with applicability, then compare the observed state with the cited source. Record the source location, examined part of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths, observed and expected states, owner, and reason for deviation.\nDo not move from citation to production in one step. Pilot the decision where practical, observe agreed signals, retain a reversal point, and verify identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders. Handle credentials, keys, recovery data, and personal information through approved secure channels.\nVerification and evidence\nKeep the source locations 29 CFR 1910.269(t)(3)(i) (eCFR anchor p-1910.269(t)(3)(i)); 29 CFR 1910.269(c)(2) (eCFR anchor p-1910.269(c)(2)) adjacent to the sanitized artifacts used for comparison. Prefer facility inventories, inspection records, alarm and shutdown tests, maintenance history, recovery exercises, and corrective actions, with enough identity and timing data for an independent recheck.\nRetain the starting state, authorization, execution record, outcome, deviation, and final state as one review package. Move disruptive checks to an approved test path. Reopen the decision when versions, design, dependencies, ownership, or official guidance changes.\nOfficial references\n\n29 CFR 1910.269 – Electric power generation, transmission, and distribution — Occupational Safety and Health Administration via eCFR",
                "datePublished": "2026-08-27T12:12:15+00:00",
                "dateModified": "2026-08-27T13:06:58+00:00",
                "mainEntityOfPage": {
                    "@id": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/"
                },
                "inLanguage": "en-US",
                "isAccessibleForFree": true,
                "author": {
                    "@type": "Organization",
                    "name": "DSE Security Editorial Team",
                    "url": "https://update.dsesecurity.com/#editorial-team"
                },
                "publisher": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "image": {
                    "@type": "ImageObject",
                    "@id": "https://update.dsesecurity.com/updates/plan-electric-power-facility-work-around-the-rule-s-emergency-and-access-controls/#primaryimage",
                    "url": "https://update.dsesecurity.com/assets/editorial/physical-security-social-v2.jpg?v=1.8.20",
                    "contentUrl": "https://update.dsesecurity.com/assets/editorial/physical-security-social-v2.jpg?v=1.8.20",
                    "width": 1200,
                    "height": 630,
                    "caption": "Plan electric-power facility work around the rule's emergency and access controls"
                },
                "articleSection": [
                    "Access Control",
                    "Business Continuity",
                    "Cybersecurity"
                ],
                "keywords": [
                    "Access Control",
                    "Business Continuity",
                    "Cybersecurity",
                    "Briefing",
                    "Advisory priority"
                ],
                "genre": "Briefing",
                "about": [
                    {
                        "@type": "Thing",
                        "name": "Access Control",
                        "url": "https://update.dsesecurity.com/topic/access-control/"
                    },
                    {
                        "@type": "Thing",
                        "name": "Business Continuity",
                        "url": "https://update.dsesecurity.com/topic/business-continuity/"
                    },
                    {
                        "@type": "Thing",
                        "name": "Cybersecurity",
                        "url": "https://update.dsesecurity.com/topic/cybersecurity/"
                    }
                ],
                "wordCount": 607,
                "timeRequired": "PT3M",
                "publishingPrinciples": "https://update.dsesecurity.com/updates/dse-updates-editorial-methodology/",
                "usageInfo": "https://update.dsesecurity.com/usage/",
                "copyrightHolder": {
                    "@id": "https://dsesecurity.com/#organization"
                },
                "copyrightNotice": "Copyright © 2026 Detection Systems & Engineering. All rights reserved.",
                "citation": {
                    "@type": "CreativeWork",
                    "name": "29 CFR 1910.269 - Electric power generation, transmission, and distribution",
                    "url": "https://www.ecfr.gov/current/title-29/section-1910.269"
                }
            }
        ]
    }
}