# Correct RMP accident and emergency-contact data on the rule's clocks

> Use 40 CFR 68.195 - Required corrections to review this narrow operational decision without extending the source beyond its stated scope.

- Canonical URL: https://update.dsesecurity.com/updates/correct-rmp-accident-and-emergency-contact-data-on-the-rule-s-clocks/
- Publisher: Detection Systems & Engineering (DSE Security)
- Author: DSE Security Editorial Team
- Published: 2026-08-27T12:09:52+00:00
- Modified: 2026-08-27T13:12:22+00:00
- Last reviewed by DSE: 2026-08-26
- Resource type: Guide
- DSE priority: Advisory
- Topics: Business Continuity, Cybersecurity
- Reading time: 3 minutes

## What you need to know

Use 40 CFR 68.195 - Required corrections to review this narrow operational decision without extending the source beyond its stated scope.

## Potentially affected

Teams, systems, services, or facilities within the stated scope of 40 CFR 68.195 - Required corrections

## DSE recommendation

Compare the observed state with the cited official source, document applicability and exceptions, and test any approved change with rollback safeguards.

## Article

Use this document to connect an official requirement or behavior to observable evidence: Correct RMP accident and emergency-contact data on the rule’s clocks. Only the official source and traced locations below supply facts. Confirm applicability before acting.

## Source fact:

The official [40 CFR 68.195 – Required corrections](https://www.ecfr.gov/current/title-40/section-68.195) from Environmental Protection Agency via eCFR supports the following bounded statements:

- After a qualifying accidental release, an owner or operator must submit the specified new accident-history data within six months or by the next required RMP update, whichever comes first. The research record locates this support at 40 CFR 68.195(a) (eCFR anchor p-68.195(a)).

- An owner or operator must correct required emergency-contact information within one month after it changes. The research record locates this support at 40 CFR 68.195(b) (eCFR anchor p-68.195(b)).

The source support ends with the statements listed above. Use them to examine essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives in the applicable environment, not to imply a wider guarantee.

## What the source does not establish

This applies only after an RMP has been submitted and only to corrections required by 40 CFR 68.195. It does not replace the full RMP update schedule or incident-investigation duties. A correct source interpretation can still be inapplicable to a particular design. Confirm identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery, ownership, and change authority instead of treating documented behavior as a deployment guarantee.

## Applicability questions

- For source statement 1 at 40 CFR 68.195(a) (eCFR anchor p-68.195(a)), which observable configuration, record, or test can confirm applicability here?

- For source statement 2 at 40 CFR 68.195(b) (eCFR anchor p-68.195(b)), which observable configuration, record, or test can confirm applicability here?

- Which owner can attest to the recorded state of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives, including exceptions?

- What baseline for identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery must accompany the source-specific observation?

- Which success, stop, and escalation criteria are written before testing begins?

## DSE recommendation:

DSE recommends using the cited source as the evidence anchor for this decision. Make the source, asset scope, owner, and expected outcome explicit in the review record. Record the source location, examined part of essential functions, upstream providers, recovery sequences, alternate work paths, and tested recovery objectives, observed and expected states, owner, and reason for deviation.

Translate the conclusion into change control only after documenting dependencies, impact, test method, expected signals, failure signals, and restoration steps. Include identity, DNS, communications, facilities, suppliers, and the people authorized to invoke recovery, while excluding secrets and sensitive personal or topology data from ordinary tickets.

## Verification and evidence

Build a reproducible chain from 40 CFR 68.195(a) (eCFR anchor p-68.195(a)); 40 CFR 68.195(b) (eCFR anchor p-68.195(b)) to the observed environment. Useful domain evidence includes business-impact records, dependency maps, exercise results, recovery timings, and open corrective actions; label every item with scope, timestamp, collector, and stable identifier.

Close the review only when the evidence, exception handling, resulting action, and after-state are linked. Schedule a new review after material technical, organizational, incident, or source changes; today’s observation is not a continuing guarantee.

## Official references

- [40 CFR 68.195 – Required corrections](https://www.ecfr.gov/current/title-40/section-68.195) — Environmental Protection Agency via eCFR

## Primary reference

- Name: 40 CFR 68.195 - Required corrections
- Authority: www.ecfr.gov
- URL: https://www.ecfr.gov/current/title-40/section-68.195
- Source publication date: Not stated by the source

## Citation and use

Preferred citation: “Correct RMP accident and emergency-contact data on the rule's clocks,” DSE Security, https://update.dsesecurity.com/updates/correct-rmp-accident-and-emergency-contact-data-on-the-rule-s-clocks/
Publishing principles: https://update.dsesecurity.com/updates/dse-updates-editorial-methodology/
Usage and citation policy: https://update.dsesecurity.com/usage/
Copyright © 2026 Detection Systems & Engineering. All rights reserved.