DSE security knowledge hub

Security knowledge,
without the noise.

Page 257 of the DSE Security Knowledge Hub, with source-backed guidance, checklists, explainers, and playbooks.

DSE-authoredOfficial sourcesReviewed guidance
Search the library
DSE post stream

Guidance and analysis from DSE

3,000 articles
DSE visual briefContinuity & recovery

Coordinate airport incident management with TSA and affected operators

Under 49 CFR 1542, the rule requires that airport operators required to have a security program under section 1542.103(c) but not subject to 14 CFR part 139, develop emergency response procedures to incidents of threats identified in paragraph (a) of this section.

Published Reviewed 3 min readBy DSE Security Editorial Team
Read the guide
DSE visual briefPhysical security

Protect and implement TSA Security Directives within required time and distribution limits

Under 49 CFR 1542, in the event that the airport operator is unable to implement the measures in the Security Directive, the airport operator must submit proposed alternative measures and the basis for submitting the alternative measures to TSA for approval.

Published Reviewed 3 min readBy DSE Security Editorial Team
Read the playbook
DSE visual briefPhysical security

Determine the applicable EPA risk-management program level before relying on prevention controls

Under 40 CFR 68, a Program 3 source must implement the management system required by section 68.15. Under 40 CFR 68, a Program 3 source must implement the prevention program requirements in sections 68.65 through 68.87.

Published Reviewed 3 min readBy DSE Security Editorial Team
Read the briefing
DSE visual briefPhysical security

Assign a qualified person or position to manage each covered risk-management process

Under 40 CFR 68, the rule requires that the owner or operator assign a qualified person or position that has the overall responsibility for the development, implementation, and integration of the risk management program elements.

Published Reviewed 3 min readBy DSE Security Editorial Team
Read the checklist
DSE visual briefPhysical security

Calculate worst-case toxic and flammable releases using the rule's scenario constraints

Under 40 CFR 68, Program 2 and 3 processes must report the flammable worst-case release scenario producing the greatest endpoint distance under section 68.22. Under 40 CFR 68, a Program 1 process must report one worst-case release scenario.

Published Reviewed 3 min readBy DSE Security Editorial Team
Read the guide
DSE visual briefManaged IT operations

Identify environmental receptors within the modeled accidental-release endpoint

Under 40 CFR 68, the rule requires that the owner or operator list in the RMP environmental receptors within a circle with its center at the point of the release and a radius determined by the distance to the endpoint defined in section 68.22(a) of this part.

Published Reviewed 3 min readBy DSE Security Editorial Team
Read the checklist