Use written management-of-change controls before modifying covered processes

Use 40 CFR 68.75 -- Chemical Accident Prevention Provisions to review this narrow operational decision without extending the source beyond its stated scope.

Integrated video surveillance and controlled entry at a modern commercial facility.
DSE visual intelligencePhysical securityPlaybook · 3 min read
Executive summary

What you need to know

Use 40 CFR 68.75 -- Chemical Accident Prevention Provisions to review this narrow operational decision without extending the source beyond its stated scope.

Potentially affected

Teams, systems, services, or facilities within the stated scope of 40 CFR 68.75 -- Chemical Accident Prevention Provisions

DSE recommendation

Compare the observed state with the cited official source, document applicability and exceptions, and test any approved change with rollback safeguards.

Keep this document to one review outcome: Use written management-of-change controls before modifying covered processes. Only the official source and traced locations below supply facts. Confirm applicability before acting.

Source fact:

The official 40 CFR 68.75 — Chemical Accident Prevention Provisions from Environmental Protection Agency via eCFR supports the following bounded statements:

  • Under 40 CFR 68, the rule requires that the owner or operator establish and implement written procedures to manage changes (except for “replacements in kind”) to process chemicals, technology, equipment, and procedures; and, changes to stationary sources that affect a covered process. The research record locates this support at 40 CFR 68.75(a) (eCFR anchor p-68.75(a)).
  • Under 40 CFR 68, the rule requires that the procedures assure that the following considerations are addressed prior to any change: impact of change on safety and health. The research record locates this support at 40 CFR 68.75(b)(2), read with 40 CFR 68.75(b) (eCFR anchor p-68.75(b)(2)).

Keep the evidence boundary at these traced claims. They support a review of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths; they do not support conclusions outside the source’s stated conditions.

What the source does not establish

Applies only to stationary sources and processes subject to 40 CFR part 68 and the applicable program level. Confirm coverage, regulated substances, process conditions, and current EPA requirements; this is not legal advice or a universal emergency-management standard. A correct source interpretation can still be inapplicable to a particular design. Confirm identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders, ownership, and change authority instead of treating documented behavior as a deployment guarantee.

Applicability questions

  • For source statement 1 at 40 CFR 68.75(a) (eCFR anchor p-68.75(a)), which observable configuration, record, or test can confirm applicability here?
  • For source statement 2 at 40 CFR 68.75(b)(2), read with 40 CFR 68.75(b) (eCFR anchor p-68.75(b)(2)), which observable configuration, record, or test can confirm applicability here?
  • Which owner can attest to the recorded state of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths, including exceptions?
  • What baseline for identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders must accompany the source-specific observation?
  • Which success, stop, and escalation criteria are written before testing begins?

DSE recommendation:

DSE recommends using the cited source as the evidence anchor for this decision. Anchor the review in the cited section and keep observation separate from interpretation. Record the source location, examined part of critical rooms, power, cooling, water, fire protection, alternate sites, physical barriers, and documented recovery paths, observed and expected states, owner, and reason for deviation.

An implementation decision needs an owner, approved window, prechecks, observable outcome, stop authority, and rollback path. Validate identity and access control, Windows DNS where networked services use it, time, communications, utilities, life-safety systems, vendors, and authorized responders before and after the test, and store only sanitized operational evidence.

Verification and evidence

Evidence should let another reviewer reproduce this decision. Retain observations beside the traced locations 40 CFR 68.75(a) (eCFR anchor p-68.75(a)); 40 CFR 68.75(b)(2), read with 40 CFR 68.75(b) (eCFR anchor p-68.75(b)(2)). Favor facility inventories, inspection records, alarm and shutdown tests, maintenance history, recovery exercises, and corrective actions, linked to stable identifiers, time, and operator.

Close the review only when the evidence, exception handling, resulting action, and after-state are linked. Schedule a new review after material technical, organizational, incident, or source changes; today’s observation is not a continuing guarantee.

Official references

Primary reference

Review the official source

40 CFR 68.75 -- Chemical Accident Prevention Provisions · Verified August 26, 2026

Open official reference ↗
Plan the next step

Need help applying this guidance safely?

DSE can help confirm applicability, protect service continuity, and validate the result across physical security and IT systems.