Use Kubernetes restartable sidecars with an explicit shutdown plan
A helper’s location in the Pod specification affects completion and termination behavior.
Read the guidePage 29 of the DSE Networks & Infrastructure knowledge center, with source-backed guidance and practical next steps.
Guidance for resilient networks, Wi-Fi, firewalls, cabling, power, exposure reduction, and connected-device planning.
A helper’s location in the Pod specification affects completion and termination behavior.
Read the guide
A regular init container is a completion gate, rather than a continuously running helper.
Read the guide
A familiar Pod name does not prove that the original Pod or its local state survived.
Read the guide
Include return paths and rule order when filtering at the subnet boundary.
Read the guide
Separate a permitted response from a newly initiated connection.
Read the guide
CISA says attackers are exploiting CVE-2026-104935, an authentication bypass in Ivanti Connect Secure that allows remote, unauthenticated command execution, to steal credentials and data. Affected appliances need the latest version now, Ivanti’s Integrity Checker may miss in-memory activity, and version 22.8 reaches end of life on January 31, 2027.
Read the playbook
OSHA’s construction electrical standard requires ground-fault circuit interrupters on 120-volt, single-phase, 15- and 20-ampere receptacles that are not part of permanent wiring, or an assured equipment grounding conductor program with written procedures, a competent person, daily inspections, periodic tests and records.
Read the checklist
Since January 13, 2025, OSHA’s construction PPE standard, 29 CFR 1926.95, says employers must ensure all personal protective equipment is of safe design and selected to properly fit each affected employee. The same section requires employers to provide most PPE at no cost and to pay for replacements unless the employee lost or intentionally damaged it.
Read the explainer
The FBI warns that cyber actors use TheMoon malware variants to install proxies on end-of-life routers with remote administration turned on, and that the BADBOX 2.0 botnet spreads through IoT devices such as streaming boxes, projectors and picture frames that were compromised before purchase or through unofficial app stores.
Read the briefing
Cisco Meraki’s end-of-life table lists end-of-support dates of May 28, 2026 for the MX65, June 19, 2026 for the MV21 and MV71 cameras, July 21, 2026 for the MR42 and October 31, 2026 for the MX84, with the MX64 following on July 26, 2027. It defines end of support as the last date a product will be affirmatively supported.
Read the briefing